Uploaded image for project: 'Couchbase Server'
  1. Couchbase Server
  2. MB-38263

[System Test] Rebalance out of an eventing node stuck for >2.5 days

    XMLWordPrintable

Details

    • Bug
    • Resolution: Fixed
    • Test Blocker
    • 7.0.0
    • 6.5.1, Cheshire-Cat
    • eventing

    Description

      Build : 7.0.0-1516
      Test : -test tests/integration/test_allFeatures_madhatter.yml -scope tests/integration/scope_Xattrs_Madhatter.yml
      Scale : 3
      Iteration 3rd

      In the longevity test, there is a step to rebalance out an Eventing node (172.23.96.148). This rebalance operation is stuck for 2 days 17 hrs.

      [2020-03-07T21:02:57-08:00, sequoiatools/couchbase-cli:7.0:7e995a] rebalance -c 172.23.108.103:8091 --server-remove 172.23.96.148 -u Administrator -p password

      Logs attached were taken after ~9 hrs of rebalance start.

      Nodes with eventing service : 172.23.104.5, 172.23.104.87, 172.23.96.148, 172.23.98.135

      Attachments

        Issue Links

          No reviews matched the request. Check your Options in the drop-down menu of this sections header.

          Activity

            People

              ankit.prabhu Ankit Prabhu
              mihir.kamdar Mihir Kamdar (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              6 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Gerrit Reviews

                  There are no open Gerrit changes

                  PagerDuty